Complete renovation of both the middle and high school cafe buildings located at Waverly Schools. New doors, frames and hardware were installed, glazing, acoustical ceiling, resilient tile flooring, sound absorbing wall panels were added to the middle school, and PLAM countertops. Painting work was also completed. The middle school received new fruit panels as well. Our supervisor on site, Greg Post, also added his own touch by making the picture frames for the high school.